| Project Location | Cold Creek near 302nd Street and 8 Ave |
| Project Description | A sequence of projects to reduce upstream erosion, install grade controls and stabilization downstream, and replace the pipe or reopen the stream channel near the Marine Hills pool. |
| Public Benefit |
- Reduced erosion - Reduced flooding |
| Project Cost | $3,800,000 |
| Project Type | SWM |
| Timeline | 2020-2023 |
Related Documents: