Ballot Letter

August 21, 2026
Subject: Mirror Lake ‘25 NTS – 5th Ave S (S 320th St to S 328th St)
Dear Neighborhood Residents:
The City conducted a traffic study through the Neighborhood Traffic Safety Program (“NTS”) to analyze traffic safety conditions on 5th Ave S between S 320th St and S 328th St. Based upon NTS criteria, the study found the installation of traffic calming devices is warranted. Below are the results, with a minimum 3.0 score needed to qualify for the program:
|
Street |
85% Speed (mph) |
Average Daily Traffic |
Park or School |
Presence of Sidewalk |
# of 5 yr. Collisions |
# of 5 yr. Injury/Fatal Collisions |
Total Score |
| 5th Ave S @ S 323rd St |
35 |
2,351 |
No |
Both Sides |
0 |
0 |
|
|
Points Scored |
2.5 |
1.0 |
0.0 |
0.0 |
0.0 |
0.0 |
3.5 |
A neighborhood traffic safety meeting was held virtually via Zoom on 2/5/2026. The attendees generally agreed that reducing speeding along 5th Ave S was a priority. Although many traffic calming countermeasures were considered, Option 1 as described on the attached ballot and map, was the most popular option. The proposed option should help to reduce vehicular speeds and cut-through traffic, as well as improve safety for pedestrians and bicyclists along 5th Ave S.
Remainder of the Process:
Installation of traffic calming devices must meet the following requirements:
- Balloting of residents within 600 feet of the proposed traffic calming device, measured along the roadway or whose sole access would be affected.
- 51% of the returned ballots must vote affirmatively.
- The City Council’s Land Use & Transportation Committee (LUTC) must concur.
- Full City Council must approve.
Please take the time to fill out this ballot and return to the City by 9/10/2026. To be counted, the ballot must be postmarked on or before the stated due date. If the proposed traffic calming devices are approved by LUTC and City Council, the Public Works will authorize the construction of the project as soon as the schedule permits. If you have any questions, concerns, or need further information regarding the NTS proposal, please contact me by email at jason.kennedy@federalwaywa.gov or by phone at 253.835.2744. For further information about the NTS Program, visit https://www.federalwaywa.gov/page/neighborhood-traffic-safety-program.
Sincerely,

Jason Kennedy
Senior Traffic Engineer
Enclosures: Ballot
Map of Option 1
cc: Rick Perez, P.E. – City Traffic Engineer
Project File
PROJECT LOCATION
5th Ave S (S 320th St to S 328th St)
Option 1 Map
PROJECT SCOPE
This project proposes to construct three (3) speed humps, paint edgeline striping, install delineators on 5th Ave S between S 320th St and S 328th St.
PROJECT SCHEDULE
Construction estimated to take place in September 2026.
PROJECT UPDATE
Project passed LUTC/Council approval in October 2025. Neighborhood ballot currently in process (August 2026).
PROJECT CONTACT
Jason Kennedy
Senior Traffic Engineer
253.835.2744